Taiyiie provides the power solution tailored for your needs from day one. We are able to choose from a range of more than 10.000 power supplies and chargers from 3V to 40V and 1.2W to 90W, all of them designed to meet and exceed European safety, EMC and environmental regulations.
Having received your BoR, a suitable product is selected from our range of existing products and then adapted to the specific needs of your application or re-designed from scratch..

A typical project process with Taiyiie at one glance

  • Bill of Requirement of application device

  • Selection of of power supply / Adaptation / Re-Design.

  • Sample production

  • Release of sample by client

  • Pilot Run 

  • Final modification

  • Release of final modification by client

  • Adaptation of certificate / certification of product

  • Mass production

The typical time frame from receipt of BoR to mass-production is 65 days

 